CLARKSVILLE, Tenn. (CLARKSVILLENOW) – Clarksville Gas and Water sub-contractors will continue sewer lateral line flushing and cleaning that began in early September through Friday on the following streets.

· Saratoga Drive
· Brandywine Drive
· King Cole Drive
· Allenwood Drive
· Kirby Drive
· Strasbourg Drive
· Collinwood Drive
· Sherwood Drive
· Canterbury Road
· Nice Drive
· Charlemagne Boulevard
· Verdun Drive
· Rue Le Mans Drive
· Melinda Drive

Sewer service will not be affected during the work, however; residents should be alert to workers and equipment in their neighborhoods.

The sewer lateral flushing will prepare lines for future sewer main line rehabilitation work this month.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.