Local

Sewer work continues next week

Sewer work continues next week

Story submitted by CGW

CLARKSVILLE, Tenn. – Clarksville Gas and Water contract workers will be performing sewer line rehabilitation work in North Clarksville during the week of September 16-20. Please be alert to the workers and their equipment on the following streets. Unfinished work will be rescheduled to the following week.

• East Bel Air Boulevard
• West Bel Air Boulevard
• Rebecca Lane
• Park Lane
• Hallbrook Drive
• Armistead Drive
• Maple Street

For further information, please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

Recent Headlines

Fresh
benbradlee-620x400

1 hour ago in News

Washington Post editor Ben Bradlee dies at 93

Bradlee led investigation into the Watergate scandal that brought down President Richard Nixon.

fowle-620x400

today in News

Jeffrey Fowle, freed from N. Korea, back on American soil

Fowle was jailed for nearly six months for leaving a Bible at a nightclub.

zone-3-apsu

yesterday in Education, Lifestyle

APSU’s Zone 3 journal recognized in “Best American Essays 2014″

Nonfiction piece by Robert Kostuck was listed as a notable in “The Best American Essays 2014.”